QEHS EthosEHS Ethos

Use cases

Risk register & assessment

Identify, score, and control hazards before they become incidents.

QEHS Ethos risk register software lets safety teams document hazards, score likelihood × consequence, set residual-risk targets, and track control measures through to closure. Live dashboards show open high-risk items and overdue reviews.

The problem

  • Risk registers live in spreadsheets that are never kept up to date
  • No visibility of residual risk after controls are applied
  • Review cycles are missed with no reminder system
  • No link between the risk register and incident data

How it works

A step-by-step walkthrough of this use case in QEHS.

  1. Log the hazard

    Create a risk record, select the hazard category, and describe the scenario.

  2. Score inherent risk

    Select likelihood (1–5) and consequence (1–5); the system calculates the inherent risk rating and highlights extremes.

  3. Add control measures

    Document existing controls across the hierarchy (elimination → PPE), scoring residual risk after each.

  4. Assign review owner

    Set a review date and responsible person; they receive automated reminders.

  5. Track and report

    Risk register report shows open items, overdue reviews, and trend against target.

See it in action

Watch a short walkthrough of this use case in the QEHS platform.

Prefer a live demo? Book a 30-minute session with a solutions engineer.

Frequently asked questions

What is risk register software?
Risk register software gives safety teams a living digital register of hazards, scored by likelihood and consequence, with residual-risk targets and control measures tracked to closure.
How are risks scored?
Teams score likelihood times consequence on a configurable matrix, set residual-risk targets, and link control measures that are tracked through to closure.
How do managers see risk status?
Live dashboards show open high-risk items and overdue reviews across every site and department.

Ready to try it?

Start your free trial and install in minutes.

No card required. Import a template, configure fields, and run your first workflow in under an hour.

Risk Register Software | QEHS Ethos