Management of change (MOC)
Control every change that could introduce new hazards to your operations.
QEHS MOC workflow captures change requests, routes them through structured risk assessment, collects multi-disciplinary approvals, and logs the post-implementation review. All communication and sign-offs are stored against the change record.
The problem
- Changes are implemented without safety review or documentation
- Email chains are used for approvals with no audit trail
- No post-implementation verification that the change worked as intended
How it works
A step-by-step walkthrough of this use case in QEHS.
Initiate the change request
Submit a change description, affected equipment or process, and proposed implementation date.
Risk assessment
Safety and engineering reviewers assess the hazards introduced by the change; controls are documented.
Multi-discipline approval
The workflow routes to HSE, engineering, and operations leads for sequential or parallel approval.
Implement with checklist
An implementation checklist confirms all pre-start conditions are met before the change goes live.
Post-implementation review
A review step confirms the change achieved its intent without introducing new hazards; the record is closed.
See it in action
Watch a short walkthrough of this use case in the QEHS platform.
Prefer a live demo? Book a 30-minute session with a solutions engineer.
Ready to try it?
Start your free trial and install in minutes.
No card required. Import a template, configure fields, and run your first workflow in under an hour.