contractors
Contractor management — pre-qual to permit
Four capabilities that compose into a real contractor program: pre-qualification, insurance tracking, training matrix, permit eligibility. Each one is a Composer block.
11 min read · updated 2026-03-20 · 2 sections
The four capabilities
- Pre-qualification — EMR, citation history, reference checks, site-specific questionnaire.
- Insurance tracking — GL, WC, umbrella, additional-insured endorsement; expiry-aware.
- Training matrix — person × skill, renewal cadence, evidence attached.
- Permit eligibility — contractor company + individual person must both be cleared before a permit issues.
The permit gate is the forcing function
The single highest-leverage control is to gate permit issuance on the contractor-company record being green. Insurance expired? No permit. Site induction stale? No permit. The gate is a guard on the permit workflow, not a policy document.