Permit-to-Work Digital Transition: From Paper to Platform in 90 Days
Step-by-step transition plan for construction and energy operators moving from paper permits to a digitised, QR-coded, mobile-first permit-to-work system — including site-board integration and contractor rollout.
Published 2026-03-18 · 28 pages · PDF 3.2 MB
Preview
The critical failure mode in permit-to-work digitalisation is not technology adoption — it is isolation-point inventory. Before any mobile app goes live, every physical isolation point must be tagged, mapped, and loaded into the system...